Production License for wind park of a total capacity of 25.5 MW

Production License for wind park of a total capacity of 25.5 MW

The Regulatory Authority of Energy (RAE) has granted a production license of a wind farm with an installed capacity of 26.4 MW and maximum output of 25.5MW to the company CITY ELECTRIC S.A. 100% subsidiary company of R.F. Energy, consisting of 8 wind turbines with a power of 3.3 MW each and a rope diameter of 112 meters. The station will be installed at the “PAPARITSA” site of the Municipal Unity of Confederacy of the Municipality of Aegialia and the Municipal Community of Leontiou of the Municipality of Erymanthos, of the Regional Unity of Achaia